Show on map
Skyline - Walzem Road 138 kV — Transmission lineAlamo City ESS — Contracted · Storage · TX · 128.2 MW · 11.2 mi awayPadua 3 — Under construction · Storage · TX · 200 MW · 12.5 mi awayUTSA TEP II — Postponed · Oil · TX · 3 MW · 12.6 mi awayAlamo 3 BESS 2 — Postponed · Storage · TX · 100 MW · 13.7 mi awayGuadalupe Generating Station — Postponed · Gas, combustion turbine · TX · 320 MW · 14.0 mi awayRush ESS — Studied · Storage · TX · 201.3 MW · 14.0 mi away
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Skyline - Walzem Road 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Bandera Electric Coop

Details

Who’s behind it

Owner
Bandera Electric Coop

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
8
Substations at the ends (as the source names them)
Skyline to Walzem Road
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itbandera electric coop
HIFLD line ID308588
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Alamo City ESS Contracted Storage 11.2 mi 128.2
Padua 3 Under construction Storage 12.5 mi 200
UTSA TEP II Postponed Oil 12.6 mi 3
Alamo 3 BESS 2 Postponed Storage 13.7 mi 100
Guadalupe Generating Station Postponed Gas, combustion turbine 14.0 mi 320
Rush ESS Studied Storage 14.0 mi 201.3

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution