Sleepy Eye — Power plant · Oil · Sleepy Eye Public Utility Comm
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1995
Net generation, 2025
42 MWh
Grid
69 kV to Northern States Power Co - Minnesota (MISO)
Location
Brown County, Minnesota
Operated by
Sleepy Eye Public Utility CommSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
31 years since 1995
Heat rate
9,929 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
SB
Mw
11.40
Units
6
Standby mw
11.40
Status rule
majority_mw_standby
In service mw
11.40
Out of service mw
0
Fuel burned (MMBtu), 2025417
Capacity factor, 20250.000
Heat rate (Btu/kWh), 20259,928.6
Net generation (MWh), 202542
Balancing authority codeMISO

Retirement

Capacity retired
1.5 MW
Generators retired
1
Capacity still in service
11.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Petroleum Liquids1.5 MWRetiredJune 2010

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Northern States Power Co - Minnesota
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Transmission lines within 15 mi (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 3 scheduled to retire, 1.5 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source