Show on map
Smithfield 1 — Power plant · Solar · Greenbacker Renewable Energy CorporationMilford Wind Corridor Phase III — Postponed · Wind · UT · 100 MW · 1.1 mi awayCape Generating Station — Under construction · Geothermal · UT · 43 MW · 9.2 mi awayCape Generating Station — Under construction · Geothermal · UT · 86 MW · 9.2 mi awayMilford Solar Phase II — Under construction · Solar · UT · 310 MW · 9.3 mi awayBlundell — Postponed · Geothermal · UT · 30 MW · 10.3 mi awayRodatherm Milford 1 — Under construction · Geothermal · UT · 1.8 MW · 12.8 mi away
  • Clean firm
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Smithfield 1

Power plant · Solar

Key facts

Power plant · Solarran 29% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
12,787 MWh
Grid
12 kV to PacifiCorp (WACM)
Location
Beaver County, Utah
Operated by
Greenbacker Renewable Energy CorporationSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000838964
Location id
L100000833267
Eia plant ids
66144
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12.50
Transmission owner
PacifiCorp
Balancing authority code
WACM
Balancing authority name
Western Area Power Administration - Rocky Mountain Region
Fuel burned (MMBtu), 202543,629
Capacity factor, 20250.292
Net generation (MWh), 202512,787
Balancing authority codeWACM

Solar array

Array area (acres)
29
AC capacity (MW)
5
DC capacity (MW)
5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2024

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Milford Wind Corridor Phase III Postponed Wind 1.1 mi 100
Cape Generating Station × 2 units Under construction Geothermal 9.2 mi 129
Milford Solar Phase II Under construction Solar 9.3 mi 310
Blundell Postponed Geothermal 10.3 mi 30
Rodatherm Milford 1 Under construction Geothermal 12.8 mi 1.8

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution