Smithfield — Power plant · Oil · Smithfield-Kinston DivisionAlexis Solar — Solar · NC · 5 MW · 4.0 km awayWommack Farm — Solar · NC · 5 MW · 11.4 km awayBear Point Solar, LLC — Solar · NC · 73.9 MW · 15.8 km awayIcarus Solar — Solar · NC · 3 MW · 21.5 km awayGrifton PV2 — Solar · NC · 56 MW · 24.2 km away
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2007 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2007
368 MWh
Location
Lenoir County, North Carolina
Operated by
Smithfield-Kinston DivisionSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2004 to 2007
Fuel burned MMBtu by year, 2004 to 2007
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
23 years since 2003

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
May 2008
Capacity retired
3.6 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Petroleum Liquids1.8 MWRetiredMay 2008
GEN2Petroleum Liquids1.8 MWRetiredMay 2008

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 25 km (9)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units GEN1, GEN2 scheduled to retire, 3.6 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Alexis Solar Postponed Solar 4.0 km 5
Wommack Farm Postponed Solar 11.4 km 5
Bear Point Solar, LLC Postponed Solar 15.8 km 73.9
Icarus Solar Postponed Solar 21.5 km 3
Grifton PV2 Postponed Solar 24.2 km 56

Sources EIA-860M

Sources

Attribution