Solano Wind: location and 3 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Solano Wind
Power plant · Wind
Key facts
Power plant · Windran 29% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2006
- Net generation, 2025
- 769,630 MWh
- Grid
- 230 kV to Pacific Gas & Electric Co (CISO)
- Location
- Solano County, California
- Operated by
- Sacramento Municipal Util Dist
Output
Details
Who’s behind it
- Owner
- Solano Wind 3, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 20 years since 2006
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Fuel burned (MMBtu), 2025 | 2,625,980 |
| Capacity factor, 2025 | 0.292 |
| Net generation (MWh), 2025 | 769,630 |
| Balancing authority code | CISO |
Wind turbines
Wind turbines
USGS records 19 of these 48 turbines as partly rebuilt since they were first put up (a new rotor or nacelle, for example).
USGS maps these turbines around a center 1.9 km from the point this page maps the plant at; the nearest turbine is 0.4 km from that point.
- Turbines
- 48
- Turbine capacity (MW)
- 172.5
- Turbine models
- 29 Vestas V90-3.0 and 19 Vestas V150-4.5
- Hub height (m)
- 80–105
- Rotor diameter (m)
- 90–150
- Years online
- 2006–2024
Source U.S. Wind Turbine Database
Source
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
Retirement
EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.- Capacity retired
- 13.2 MW
- Generators retired
- 1
- Next scheduled retirement
- March 2031
- Capacity scheduled to retire
- 87 MW
- Generators scheduled to retire
- 2
- Share of in-service capacity scheduled
- 29%
- Capacity still in service
- 300.5 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 13.2 MW | Retired | June 2023 |
| 2 | Onshore Wind Turbine | 24 MW | Scheduled to retire | March 2031 |
| 2B | Onshore Wind Turbine | 63 MW | Scheduled to retire | March 2031 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 230 kV
- Transmission or distribution system owner
- Pacific Gas & Electric Co
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
Transmission lines within 25 km (10)
Connection points within 25 km (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Sacramento Municipal Util Dist | Operator | EIA-860M | ||
| Solano Wind 3, LLC | Owner | 42.6% | 31 Dec 2025 | EIA-860 |
Timeline
- Stated Units 2, 2B scheduled to retire, 87 MW · EIA-860M
- Stated Unit 1 scheduled to retire, 13.2 MW · EIA-860M
- In service · EIA-860M
Sources
8 sourcesSources EIA-860M · GEM · LBNL · CAISO · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISO Public Queue ReportSource: California ISO
- U.S. Wind Turbine Database (USWTDB) — USGS, American Clean Power Association and LBNL; one row per turbineMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Solano Wind Postponed | Wind | 0.0 km | 95.5 |
| Oakley Generating Station Withdrawn | Gas, combined cycle | 12.0 km | 672.3 |
| Pittsburg RV Solar Under construction | Solar | 13.4 km | 2.8 |
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- CAISO Public Queue ReportSource: California ISO