- Wind & solar
- Retired
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Retired
Solar Photovoltaic Project #02: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Solar Photovoltaic Project #02
Power plant · Solar
Key facts
Power plant · Solar Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2009
- Net generation, 2023
- -19 MWh
- Grid
- 0.5 kV to Southern California Edison Co (CISO)
- Location
- San Bernardino County, California
- Operated by
- Southern California Edison CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2023
- -19
MWh - Fuel burned, 2023
- 0
MMBtu - Capacity factor, 2023
- Not stated
- Heat rate, 2023
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2023 | -19 | 0 | — | — |
| 2022 | 710 | 2,421 | 8.1% | — |
| 2021 | 1,190 | 10,523 | 13.6% | — |
| 2020 | 722 | 6,329 | 8.2% | — |
| 2019 | 661 | 5,885 | 7.5% | — |
| 2018 | 365 | 3,322 | 4.2% | — |
| 2017 | 580 | 5,343 | 6.6% | — |
| 2016 | 899 | 8,300 | 10.2% | — |
| 2015 | 703 | 6,552 | 8.0% | — |
| 2014 | 791 | 7,523 | 9.0% | — |
| 2013 | 951 | 9,072 | 10.9% | — |
| 2012 | 887 | 8,438 | 10.1% | — |
| 2011 | 1,312 | 12,746 | 15.0% | — |
| 2010 | 1,421 | 13,863 | 16.2% | — |
| 2009 | 53 | 517 | 0.6% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.