Key facts
Power plant · Solar Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2013
- Net generation, 2025
- 0 MWh
- Grid
- 12 kV to Southern California Edison Co (CISO)
- Location
- San Bernardino County, California
- Operated by
- Southern California Edison CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 0
MWh - Fuel burned, 2025
- 0
MMBtu - Capacity factor, 2025
- Not stated
- Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 0 | 0 | — | — |
| 2024 | 0 | 0 | — | — |
| 2023 | -15 | 0 | — | — |
| 2022 | 1,661 | 5,666 | 7.6% | — |
| 2021 | 3,112 | 27,524 | 14.2% | — |
| 2020 | 3,804 | 33,348 | 17.3% | — |
| 2019 | 3,123 | 27,811 | 14.3% | — |
| 2018 | 4,305 | 39,195 | 19.7% | — |
| 2017 | 3,837 | 35,350 | 17.5% | — |
| 2016 | 4,516 | 41,692 | 20.6% | — |
| 2015 | 4,846 | 45,160 | 22.1% | — |
| 2014 | 4,849 | 46,114 | 22.1% | — |
| 2013 | 5,427 | 51,780 | 24.8% | — |
| 2012 | 0 | 0 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.