- Wind & solar
- Retired
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Retired
Solar Photovoltaic Project #28: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Solar Photovoltaic Project #28
Power plant · Solar
Key facts
Power plant · Solar Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2015
- Net generation, 2025
- 0 MWh
- Grid
- 12 kV to Southern California Edison Co (CISO)
- Location
- San Bernardino County, California
- Operated by
- Southern California Edison CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 0
MWh - Fuel burned, 2025
- 0
MMBtu - Capacity factor, 2025
- Not stated
- Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 0 | 0 | — | — |
| 2024 | 0 | 0 | — | — |
| 2023 | 221 | 781 | 0.7% | — |
| 2022 | 2,335 | 7,967 | 7.6% | — |
| 2021 | 4,222 | 37,341 | 13.8% | — |
| 2020 | 3,711 | 32,535 | 12.1% | — |
| 2019 | 3,632 | 32,343 | 11.8% | — |
| 2018 | 5,017 | 45,676 | 16.4% | — |
| 2017 | 4,881 | 44,970 | 15.9% | — |
| 2016 | 5,543 | 51,174 | 18.0% | — |
| 2015 (11 of 12 months) | 6,443 | 60,044 | — | — |
| 2012 | 0 | 0 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.