Solar Photovoltaic Project #42
Power plant · Solar
Key facts
Power plant · Solarran 15% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2012
- Net generation, 2025
- 6,432 MWh
- Grid
- 12 kV to Southern California Edison Co (CISO)
- Location
- Tulare County, California
- Operated by
- Southern California Edison CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 6,432
MWh - Fuel burned, 2025
- 21,946
MMBtu - Capacity factor, 2025
- 14.7
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 6,432 | 21,946 | 14.7% | — |
| 2024 | 7,575 | 25,847 | 17.2% | — |
| 2023 | 6,908 | 23,567 | 15.8% | — |
| 2022 | 9,378 | 31,999 | 21.4% | — |
| 2021 | 8,089 | 71,539 | 18.5% | — |
| 2020 | 6,673 | 58,501 | 15.2% | — |
| 2019 | 8,169 | 72,745 | 18.6% | — |
| 2018 | 7,420 | 67,551 | 16.9% | — |
| 2017 | 8,134 | 74,939 | 18.6% | — |
| 2016 | 8,781 | 81,069 | 20.0% | — |
| 2015 | 9,285 | 86,525 | 21.2% | — |
| 2014 | 8,862 | 84,277 | 20.2% | — |
| 2013 | 9,366 | 89,360 | 21.4% | — |
| 2012 (2 of 12 months) | 6,343 | 60,360 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.