Show on map
Solar Star California II LLC — Power plant · Solar · Solar Star California II LLCNTT GLOBAL DATA CENTERS — Built · Large load · CA · 9.3 mi awayMaxim Crane - 1574 – SMF Data Center — Filed · Large load · CA · 9.6 mi awayJuniper Creek Storage — Permitted · Storage · CA · 200 MW · 14.8 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Solar Star California II LLC

Power plant · Solar

Key facts

Power plant · Solarran 22% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
3,842 MWh
Grid
21 kV to Sacramento Municipal Util Dist (BANC)
Location
Sacramento County, California
Operated by
Solar Star California II LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2012 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
14 years since 2012
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817813
Location id
L100000814990
Eia plant ids
57933
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
21
Transmission owner
Sacramento Municipal Util Dist
Balancing authority code
BANC
Balancing authority name
Balancing Authority of Northern California
Fuel burned (MMBtu), 202513,111
Capacity factor, 20250.219
Net generation (MWh), 20253,842
Balancing authority codeBANC

Solar array

Array area (acres)
12.2
AC capacity (MW)
2
DC capacity (MW)
2.3
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2012

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NTT GLOBAL DATA CENTERS Built Large load 9.3 mi
Maxim Crane - 1574 – SMF Data Center Filed Large load 9.6 mi
Juniper Creek Storage Permitted Storage 14.8 mi 200

Sources EPA ICIS-Air · FAA OE/AAA · EIA-860M

Sources

Attribution