Show on map
South Robeson Farm — Power plant · Solar · USF Surry, LLCRhubarb One — Postponed · Solar · NC · 5 MW · 2.2 mi awayPee Dee Solar II — Postponed · Solar · SC · 2 MW · 6.3 mi awayHilly Branch — Postponed · Solar · NC · 2 MW · 7.7 mi awayClark Solar — Postponed · Solar · SC · 2 MW · 9.4 mi awayCotton Solar — Permitted · Solar · SC · 16 MW · 10.4 mi awayAtlantic Solar — Postponed · Solar · SC · 1 MW · 12.1 mi awayPee Dee Solar I — Postponed · Solar · SC · 2 MW · 12.1 mi awayTopaz Solar (SC) — Postponed · Solar · SC · 2 MW · 12.2 mi awaySandifer Solar — Postponed · Solar · SC · 2 MW · 12.4 mi awaySoy Solar — Postponed · Solar · NC · 5 MW · 13.5 mi awayIsland Grove Solar — Postponed · Solar · NC · 2 MW · 13.7 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

South Robeson Farm

Power plant · Solar

Key facts

Power plant · Solarran 15% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
6,527 MWh
Grid
23 kV to Duke Energy Progress - (NC) (CPLE)
Location
Robeson County, North Carolina
Operated by
USF Surry, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2012 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
14 years since 2012
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817851
Location id
L100000815023
Eia plant ids
58273
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
22.80
Transmission owner
Duke Energy Progress - (NC)
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Fuel burned (MMBtu), 202522,270
Capacity factor, 20250.149
Net generation (MWh), 20256,527
Balancing authority codeCPLE

Solar arrays

Array area (acres)
25.1
AC capacity (MW)
4.9
DC capacity (MW)
6.4
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2012

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rhubarb One Postponed Solar 2.2 mi 5
Pee Dee Solar II Postponed Solar 6.3 mi 2
Hilly Branch Postponed Solar 7.7 mi 2
Clark Solar Postponed Solar 9.4 mi 2
Cotton Solar Permitted Solar 10.4 mi 16
Atlantic Solar Postponed Solar 12.1 mi 1
Pee Dee Solar I Postponed Solar 12.1 mi 2
Topaz Solar (SC) Postponed Solar 12.2 mi 2
Sandifer Solar Postponed Solar 12.4 mi 2
Soy Solar Postponed Solar 13.5 mi 5
Island Grove Solar Postponed Solar 13.7 mi 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution