Southeast Berrien Generating Facility — Power plant · Biomass · North American Natural ResAMAZON DATA SERVICES INCORPORATED — Built · Large load · IN · 10.9 mi awaySt Joseph Energy Center — Postponed · Gas, combined cycle · IN · 1,406 MW · 11.0 mi awayChampion Solar I — Postponed · Solar · IN · 51.9 MW · 11.1 mi away
  • Bioenergy
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Southeast Berrien Generating Facility

Power plant · Biomass

Key facts

Power plant · Biomassran 49% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2025
20,457 MWh
Grid
69 kV to Indiana Michigan Power Co (PJM)
Location
Berrien County, Michigan
Operated by
North American Natural ResSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2014 to 2025
Fuel burned MMBtu by year, 2014 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
17 years since 2009
Heat rate
12,394 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
69
Transmission owner
Indiana Michigan Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 2025253,537
Capacity factor, 20250.486
Heat rate (Btu/kWh), 202512,393.7
Net generation (MWh), 202520,457
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AMAZON DATA SERVICES INCORPORATED Built Large load 10.9 mi
St Joseph Energy Center Postponed Gas, combined cycle 11.0 mi 1,406
Champion Solar I Postponed Solar 11.1 mi 51.9

Sources EPA ICIS-Air · EIA-860M