- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Southwestern Bell Telephone: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Southwestern Bell Telephone
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1992
- Net generation, 2025
- 110 MWh
- Grid
- 14 kV to Union Electric Co - (MO) (MISO)
- Location
- St Louis City County, Missouri
- Operated by
- At&T IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 110
MWh - Fuel burned, 2025
- 1,106
MMBtu - Capacity factor, 2025
- 0.1
% - Heat rate, 2025
- 10,054
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 35 | 508 | — | 14,514 |
| 2025 | 110 | 1,106 | 0.1% | 10,054 |
| 2024 | 62 | 661 | 0.0% | 10,661 |
| 2023 | 31 | 440 | 0.0% | 14,194 |
| 2022 | 286 | 2,788 | 0.2% | 9,748 |
| 2021 | 40 | 450 | 0.0% | 11,250 |
| 2020 | 53 | 468 | 0.0% | 8,830 |
| 2019 | 24 | 395 | 0.0% | 16,458 |
| 2018 | 24 | 286 | 0.0% | 11,917 |
| 2017 | 37 | 332 | 0.0% | 8,973 |
| 2016 | 20 | 372 | 0.0% | 18,600 |
| 2015 | 53 | 487 | 0.0% | 9,189 |
| 2014 | 155 | 1,467 | 0.1% | 9,464 |
| 2013 | 36 | 337 | 0.0% | 9,361 |
| 2012 | 72 | 667 | 0.1% | 9,264 |
| 2011 | 101 | 1,614 | 0.1% | 15,980 |
| 2010 | 103 | 1,648 | 0.1% | 16,000 |
| 2009 | 146 | 1,141 | 0.1% | 7,815 |
| 2008 | 1,135 | 10,274 | 0.8% | 9,053 |
| 2007 | 49 | 726 | 0.0% | 14,816 |
| 2006 | 43 | 497 | 0.0% | 11,523 |
| 2005 | 56 | 133 | 0.0% | — |
| 2004 | 29 | 196 | 0.0% | 6,684 |
| 2003 | 58 | 587 | 0.0% | 10,121 |
| 2002 | 71 | 661 | 0.1% | 9,310 |
| 2001 | 49 | 504 | 0.0% | 10,286 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.