Show on map
Southwick Solar, LLC Community Solar — Power plant · Solar · Navisun LLCHolyoke MA BESS 1 — Under construction · Storage · MA · 5 MW · 8.5 mi awayCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 10.0 mi awayBroadleaf Solar — Filed · Solar · CT · 200 MW · 10.1 mi awayChicopee BESS — Under construction · Storage · MA · 5 MW · 10.1 mi awayWindsor Locks — Under construction · Solar · CT · 1.8 MW · 10.1 mi awayDollar Tree Solar One — Postponed · Solar · CT · 2 MW · 10.8 mi awayPalmer Renewable Energy — Postponed · Biomass · MA · 42 MW · 11.7 mi awayRiverside Holyoke — Postponed · Hydro · MA · 1.1 MW · 12.1 mi awayHadley Falls — Postponed · Hydro · MA · 3.5 MW · 12.4 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Southwick Solar, LLC Community Solar

Power plant · Solar

Key facts

Power plant · Solarran 9% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
3,527 MWh
Grid
13 kV to NSTAR Electric Company (ISNE)
Location
Hampden County, Massachusetts
Operated by
Navisun LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001048777
Location id
L100001043273
Eia plant ids
67904
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
13.20
Transmission owner
NSTAR Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 202512,033
Capacity factor, 20250.086
Net generation (MWh), 20253,527
Balancing authority codeISNE

Solar array

Array area (acres)
17.8
AC capacity (MW)
4.7
DC capacity (MW)
4.7
Site type
Greenfield
Began operating
2025

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Holyoke MA BESS 1 Under construction Storage 8.5 mi 5
CT Airport Authority Solar One Announced Solar 10.0 mi 4
Broadleaf Solar Filed Solar 10.1 mi 200
Chicopee BESS Under construction Storage 10.1 mi 5
Windsor Locks Under construction Solar 10.1 mi 1.8
Dollar Tree Solar One Postponed Solar 10.8 mi 2
Palmer Renewable Energy Postponed Biomass 11.7 mi 42
Riverside Holyoke Postponed Hydro 12.1 mi 1.1
Hadley Falls Postponed Hydro 12.4 mi 3.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution