Show on map
Speedway North Bldg 1-sllas701 — Power plant · Solar · Prologis Logistics Services IncorporatedSWITCH LTD. — Built · Large load · NV · 11.0 mi awaySwitch Data Center Building — Filed · Large load · NV · 11.1 mi awaySwitch NAP 16 — Under construction · Large load · NV · 11.1 mi awayJASMINE DEVELOPMENT, LLC — Built · Large load · NV · 13.3 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Speedway North Bldg 1-sllas701

Power plant · Solar

Key facts

Power plant · Solarran 7% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
582 MWh
Grid
0.8 kV to Nevada Power Co (NEVP)
Location
Clark County, Nevada
Operated by
Prologis Logistics Services IncorporatedSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
3 years since 2023
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
0.800
Transmission owner
Nevada Power Co
Balancing authority code
NEVP
Balancing authority name
Nevada Power Company
Fuel burned (MMBtu), 20251,986
Capacity factor, 20250.066
Net generation (MWh), 2025582
Balancing authority codeNEVP

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SWITCH LTD. Built Large load 11.0 mi
Switch Data Center Building Filed Large load 11.1 mi
Switch NAP 16 Under construction Large load 11.1 mi
JASMINE DEVELOPMENT, LLC Built Large load 13.3 mi

Sources EPA ICIS-Air · FAA OE/AAA

Sources

Attribution