Show on map
Speedway North Bldg 1-sllas701 — Power plant · Solar · Prologis Logistics Services Incorporated
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Speedway North Bldg 1-sllas701

Power plant · Solar

Key facts

Power plant · Solarran 7% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
582 MWh
Grid
0.8 kV to Nevada Power Co (NEVP)
Location
Clark County, Nevada
Operated by
Prologis Logistics Services IncorporatedSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
582MWh
Fuel burned, 2025
1,986MMBtu
Capacity factor, 2025
6.6%
Heat rate, 2025
Not stated
Capacity factor % of full output, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20255821,9866.6%—
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 27, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution