Show on map
Spencer Clean Energy Center (BESS) — Power plant · Storage · On Energy StorageTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 4.6 mi awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 7.4 mi awayNET Power La Porte Station — Studied · Gas, combustion turbine · TX · 25.5 MW · 8.3 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 11.2 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 11.9 mi awayBerkman Storage — Postponed · Storage · TX · 100 MW · 12.8 mi away
  • Combustion
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Spencer Clean Energy Center (BESS)

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
-363 MWh
Grid
12 kV to CenterPoint Energy (ERCO)
Location
Harris County, Texas
Operated by
On Energy StorageSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
12.50
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-363
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -363.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Texas Petrochemicals Postponed Gas, combined cycle 4.6 mi 560
TX LaPort 10060 Porter Road Solar Postponed Solar 7.4 mi 1.6
NET Power La Porte Station Studied Gas, combustion turbine 8.3 mi 25.5
Greens Bayou 6 Under construction Gas, combustion turbine 11.2 mi 445
TX Houston 7080 Express Lane Postponed Storage 11.9 mi 1.5
Berkman Storage Postponed Storage 12.8 mi 100

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution