Show on map
Spring Grove I — Power plant · Solar · Dominion Energy Inc.Kruger Energy Mantura Solar, LLC — Postponed · Solar · VA · 60 MW · 8.2 mi awaySycamore Cross Solar — Announced · Solar · VA · 208.2 MW · 14.5 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Spring Grove I

Power plant · Solar

Key facts

Power plant · Solarran 21% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
184,300 MWh
Grid
230 kV to Virginia Electric & Power Co (PJM)
Location
Surry County, Virginia
Operated by
Dominion Energy Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805015
Location id
L100000804363
Eia plant ids
61986
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
230
Transmission owner
Virginia Electric & Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 2025628,832
Capacity factor, 20250.215
Net generation (MWh), 2025184,300
Balancing authority codePJM

Solar arrays

Array area (acres)
485.9
AC capacity (MW)
97.9
DC capacity (MW)
135.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2020

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Kruger Energy Mantura Solar, LLC Postponed Solar 8.2 mi 60
Sycamore Cross Solar Announced Solar 14.5 mi 208.2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution