St Cloud: location and 3 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
St Cloud
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1961
- Net generation, 2007
- -323 MWh
- Grid
- 230 kV to Orlando Utilities Comm (FMPP)
- Location
- Osceola County, Florida
- Operated by
- Orlando Utilities Comm
Output
- Gas
- Oil
Details
Who’s behind it
- Owner
- St Cloud City of
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 65 years since 1961
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | FMPP |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- March 2008
- Capacity retired
- 29.9 MW
- Generators retired
- 7
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Natural Gas Internal Combustion Engine | 2 MW | Retired | March 2008 |
| 2 | Natural Gas Internal Combustion Engine | 5.8 MW | Retired | March 2008 |
| 3 | Natural Gas Internal Combustion Engine | 2 MW | Retired | March 2008 |
| 4 | Natural Gas Internal Combustion Engine | 3.7 MW | Retired | March 2008 |
| 6 | Natural Gas Internal Combustion Engine | 3.7 MW | Retired | March 2008 |
| 7 | Natural Gas Internal Combustion Engine | 6.3 MW | Retired | March 2008 |
| 8 | Natural Gas Internal Combustion Engine | 6.4 MW | Retired | March 2008 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 230 kV
- Transmission or distribution system owner
- Orlando Utilities Comm
- Balancing authority
- Florida Municipal Power Pool
- NERC region
- SERC
Transmission lines within 25 km (10)
- Holopaw 230 kV line
- Taft - Magnolia Ranch North 230 kV
- Airport Industrial Park - Lake Nona 230 kV
- Cane Island 230 kV line
- Lake Nona - Stanton 230 kV
- Lake Nona 230 kV line
- Taft 230 kV line
- Osceola Solar Facility - Holopaw 230 kV
- Magnolia Ranch North - Stanton 230 kV
- Osceola Solar Facility - West Lake Wales 230 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Orlando Utilities Comm | Operator | EIA-860M | ||
| St Cloud City of | Owner | 100.0% | 31 Dec 2025 | EIA-860 |
Timeline
- Stated Units 1, 2, 3, 4, 6, 7, 8 scheduled to retire, 29.9 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Lonesome Camp Solar Plant Under construction | Solar | 21.2 km | 74.9 |
| COMCAST DATA CENTER Built | Large load | 23.0 km | |
| CORESITE REAL ESTATE OR1 LLC Built | Large load | 24.3 km |
Sources EIA-860M · Berkeley Lab · EPA ICIS-NPDES · EPA ICIS-Air
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)