- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
St. Michael: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
St. Michael
Power plant · Oil
Key facts
Power plant · Oil Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2015
- Net generation, 2017
- 0 MWh
- Grid
- 14 kV to Alaska Village Elec Coop, Inc
- Location
- Nome County, Alaska
- Operated by
- Alaska Village Elec Coop, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 11 years since 2015
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Eia status |
|
Retirement
- Capacity retired
- 1 MW
- Generators retired
- 3
- Capacity still in service
- 0.7 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| UNIT1 | Petroleum Liquids | 0.5 MW | Retired | August 2015 |
| UNIT2 | Petroleum Liquids | 0.3 MW | Retired | August 2015 |
| UNIT3 | Petroleum Liquids | 0.2 MW | Retired | August 2015 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 14 kV
- Transmission or distribution system owner
- Alaska Village Elec Coop, Inc
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units UNIT1, UNIT2, UNIT3 scheduled to retire, 1 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory