- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Retired
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Loads
- In development
- Under construction
- Retired
- Size not stated
Stallings: location and 4 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Stallings
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 0% of 2012 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1970
- Net generation, 2012
- 1,852 MWh
- Grid
- 138 kV (MISO)
- Location
- Madison County, Illinois
- Operated by
- Dynegy Midwest Generation IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 56 years since 1970
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- January 2013
- Capacity retired
- 95.2 MW
- Generators retired
- 4
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | 23.8 MW | Retired | January 2013 |
| 2 | Natural Gas Fired Combustion Turbine | 23.8 MW | Retired | January 2013 |
| 3 | Natural Gas Fired Combustion Turbine | 23.8 MW | Retired | January 2013 |
| 4 | Natural Gas Fired Combustion Turbine | 23.8 MW | Retired | January 2013 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- SERC
Transmission lines within 25 km (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2, 3, 4 scheduled to retire, 95.2 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| SV CSG South Roxana Filed | Solar | 8.9 km | 5 |
| SV CSG Roxana 1 Under construction | Solar | 11.7 km | 2.5 |
| SV CSG East St Louis Under construction | Solar | 14.1 km | 5 |
| OPPIDAN DATA CENTER Under construction | Large load | 24.2 km |
Sources EIA-860M · EPA ICIS-NPDES