Show on map
Stanberry — Power plant · Gas, reciprocating engine · City of Stanberry - (MO)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engine Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1958
Net generation, 2025
0 MWh
Grid
69 kV to City of Stanberry - (MO) (AECI)
Location
Gentry County, Missouri
Operated by
City of Stanberry - (MO)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025
Fuel burned MMBtu by year, 2002 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
68 years since 1958
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
SB
Mw
4.30
Units
4
Standby mw
4.30
Status rule
majority_mw_standby
In service mw
4.30
Out of service mw
0
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeAECI
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Retirement

Capacity retired
0.6 MW
Generators retired
2
Capacity still in service
4.3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Petroleum Liquids0.3 MWRetiredJanuary 2002
4Petroleum Liquids0.3 MWRetiredJanuary 2002

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
City of Stanberry - (MO)
Balancing authority
Associated Electric Cooperative, Inc.
NERC region
SERC
Transmission lines within 25 km (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 3, 4 scheduled to retire, 0.6 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source