Show on map
Station G Atwater 230 kV line — Transmission lineScholl Canyon — Under construction · Biomass · CA · 12 MW · 4.8 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 5.0 mi awayGlenarm BESS Plant — Filed · Battery storage · CA · 25 MW · 6.2 mi awayFoothill Solar Project — Postponed · Solar · CA · 1.1 MW · 6.8 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 7.3 mi awayAB Van Nuys — Announced · Solar · CA · 1.6 MW · 7.4 mi awayCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 7.6 mi awayVan Norman Bypass Solar Project — Postponed · Solar · CA · 2 MW · 10.5 mi awayBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 11.0 mi away20525 Nordhoff PV (North) — Under construction · Solar · CA · 1.9 MW · 13.3 mi awayCPA 3777 Workman — Postponed · Solar · CA · 1.9 MW · 13.7 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Station G Atwater 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA

Details

Who’s behind it

No companies named in filings yet.

Book a call About these actionsBook a call: our team gets you what you need.

Mapped route length (miles)
8
Substations at the ends (as the source names them)
Station G Atwater
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID307920
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Scholl Canyon Under construction Biomass 4.8 mi 12
LATTC South Campus Solar Postponed Solar 5.0 mi 1.1
Glenarm BESS Plant Filed Battery storage 6.2 mi 25
Foothill Solar Project Postponed Solar 6.8 mi 1.1
PRIME DATA CENTER VERNON Built Large load 7.3 mi
AB Van Nuys Announced Solar 7.4 mi 1.6
California Institute of Technology Postponed Gas, combined cycle 7.6 mi 16.5
Van Norman Bypass Solar Project Postponed Solar 10.5 mi 2
Bandini - SLLAX710 Under construction Solar 11.0 mi 1.3
20525 Nordhoff PV (North) Under construction Solar 13.3 mi 1.9
CPA 3777 Workman Postponed Solar 13.7 mi 1.9

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution