Stilwell 161 kV line: route and 6 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Stilwell 161 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 161 kV
- States crossed
- US-KS, US-MO
- Owner (as stated)
- Evergy Metro
Details
Who’s behind it
- Owner
- Evergy Metro
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 14
- Substations at the ends (as the source names them)
- Stilwell
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | evergy metro |
| HIFLD line ID | 109120 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| VELVET TECH SERVICES Built | Large load | 0.5 mi | |
| ORACLE LEE'S SUMMIT DATA CENTER Built | Large load | 7.2 mi | |
| NETRALITY DATA CENTERS - KC2 (AIR) Unknown | Large load | 9.5 mi | |
| CUBE NA DATA CENTER COMPANY LLC Built | Large load | 13.5 mi | |
| CLOP OLATHE - 10MW DATA CENTER (AIR) Built | Large load | 13.8 mi | |
| KANSAS CITY DATA CENTER C (AIR) Built | Large load | 14.1 mi |