Show on map
Stingray Facility — Power plant · Gas, combustion turbine · Targa Midstream Services LP
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Stingray Facility

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 0% of 2018 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1977
Net generation, 2018
10 MWh
Location
Cameron County, Louisiana

Output

Net generation MWh by year, 2001 to 2019
Fuel burned MMBtu by year, 2001 to 2019
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
49 years since 1977
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110015706119
NAICS code
211112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1004841
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
June 2019
Capacity retired
2.5 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1S72Natural Gas Fired Combustion Turbine2.5 MWRetiredJune 2019

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
MISO
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies11
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Targa Midstream Services LP Operator EIA-860M
Targa Resources Owner 100.0% 31 Dec 2023 EPA GHGRP
Targa Resources Owner 100.0% 31 Dec 2023 EPA GHGRP
Targa Resources Owner 100.0% 31 Dec 2023 EPA GHGRP
Targa Resources Owner 100.0% 31 Dec 2023 EPA GHGRP
Targa Resources Owner 100.0% 31 Dec 2023 EPA GHGRP
Targa Resources Owner 100.0% 31 Dec 2023 EPA GHGRP
Targa Resources Owner 100.0% 31 Dec 2023 EPA GHGRP
Targa Resources Owner 100.0% 31 Dec 2023 EPA GHGRP
Targa Resources Owner 100.0% 31 Dec 2023 EPA GHGRP
Targa Resources Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit 1S72 scheduled to retire, 2.5 MW · EIA-860M
  • In service · EIA-860M