Show on map
Stolle Road - Five Mile 345 kV — Transmission lineBakerstand Solar (NY) — Postponed · Solar · NY · 20 MW · 0.8 mi awayKCE NY 10, LLC — Announced · Storage · NY · 20 MW · 6.5 mi awayAllegany Wind Farm — Postponed · Wind · NY · 72.5 MW · 11.4 mi awayAlle-Catt Wind Energy LLC — Under construction · Wind · NY · 340 MW · 13.5 mi awaySL Pembroke — Under construction · Solar · NY · 4 MW · 14.7 mi awaySL Pembroke 2 — Under construction · Solar · NY · 5 MW · 14.7 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Stolle Road - Five Mile 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-NY

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
52
Substations at the ends (as the source names them)
Stolle Road to Five Mile
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID166582
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bakerstand Solar (NY) Postponed Solar 0.8 mi 20
KCE NY 10, LLC Announced Storage 6.5 mi 20
Allegany Wind Farm Postponed Wind 11.4 mi 72.5
Alle-Catt Wind Energy LLC Under construction Wind 13.5 mi 340
SL Pembroke Under construction Solar 14.7 mi 4
SL Pembroke 2 Under construction Solar 14.7 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution