Show on map
Stoltze CoGen1 — Power plant · Biomass · F H Stoltze Land & Lumber Co
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Stoltze CoGen1

Power plant · Biomass

Key facts

Power plant · Biomassran 85% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
20,961 MWh
Grid
13 kV to Flathead Electric Coop Inc (BPAT)
Location
Flathead County, Montana
Operated by
F H Stoltze Land & Lumber CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2026
Fuel burned MMBtu by year, 2013 to 2026
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Wood/Wood Waste Biomass”
Age
13 years since 2013
Heat rate
26,090 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
13
Transmission owner
Flathead Electric Coop Inc
Balancing authority code
BPAT
Balancing authority name
Bonneville Power Administration
Fuel burned (MMBtu), 2025546,869
Capacity factor, 20250.855
Heat rate (Btu/kWh), 202526,089.8
Net generation (MWh), 202520,961
Balancing authority codeBPAT

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source