Show on map
Stryker Creek 345 kV line — Transmission lineMartin Lake — Postponed · Coal · TX · 800 MW · 0.3 mi awayNacogdoches Power — Postponed · Gas, combined cycle · TX · 925 MW · 6.8 mi awayHallsville — Announced · Gas, combustion turbine · TX · 450 MW · 14.9 mi away
  • Combustion
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Stryker Creek 345 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-TX
Owner (as stated)
Cherokee County Elec Coop Assn

Details

Who’s behind it

Owner
Cherokee County Elec Coop Assn

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
41
Substations at the ends (as the source names them)
Stryker Creek
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcherokee county elec coop assn
HIFLD line ID302930
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Martin Lake Postponed Coal 0.3 mi 800
Nacogdoches Power Postponed Gas, combined cycle 6.8 mi 925
Hallsville Announced Gas, combustion turbine 14.9 mi 450

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution