Show on map
- Wind & solar
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
- Other infrastructure
Stuart Substation - Hillcrest Solar 345 kV: route and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Stuart Substation - Hillcrest Solar 345 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 345 kV
- States crossed
- US-OH
- Owner (as stated)
- American Electric Power
Details
Who’s behind it
- Owner
- American Electric Power
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 33
- Substations at the ends (as the source names them)
- Stuart Substation to Hillcrest Solar
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | american electric power |
| HIFLD line ID | 114239 |
| Voltage class | 345 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Palomino Solar Under construction | Solar | 11.8 mi | 200 |
| Yellow Wood Solar Energy LLC Under construction | Solar | 14.8 mi | 300 |
Sources EIA-860M