Show on map
Substation (OSM way 1495698623) — SubstationPeri Peri Solar — Postponed · Solar · TX · 115 MW · 5.6 mi awayLumberton PV I, LLC — Announced · Solar · TX · 200 MW · 8.4 mi away
  • Wind & solar
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Substation (OSM way 1495698623)

Substation

Key facts

Substation Operating
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 11 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Osm id1495698623
RegionUS-TX
Outline
Type
Polygon
Coordinates
-94.41, 30.33, -94.41, 30.33, -94.41, 30.33, -94.41, 30.33, -94.41, 30.33
Osm typeway
Scope regionsUS-TX
States crossedUS-TX
Extract regionsUS-TX
Location methodarea_centroid
Voltage unknownYes
Coverage regionsUS-TX
Voltage assumed kvNo

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Peri Peri Solar Postponed Solar 5.6 mi 115
Lumberton PV I, LLC Announced Solar 8.4 mi 200

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution