Show on map
Substation (OSM way 550186234) — SubstationHallmark — Postponed · Solar · TX · 42 MW · 5.1 mi awayMajors DC Site – Data Center Building #1 — Filed · Large load · TX · 8.3 mi awayROYSE CITY DATA CENTER — Under construction · Large load · TX · 11.3 mi awaySandman Solar — Postponed · Storage · TX · 100 MW · 12.9 mi away
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Substation (OSM way 550186234)

Substation

Key facts

Substation Operating
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 15 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Osm id550186234
RegionUS-TX
Outline
Type
Polygon
Coordinates
-96.14, 33.11, -96.14, 33.11, -96.13, 33.11, -96.13, 33.11, -96.14, 33.11
Osm typeway
Voltage (kV)138
Voltage raw138000;69000
Voltages kv138, 69
Scope regionsUS-TX
Voltage class100-161 kV
States crossedUS-TX
Extract regionsUS-TX
Location methodarea_centroid
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hallmark Postponed Solar 5.1 mi 42
Majors DC Site – Data Center Building #1 Filed Large load 8.3 mi
ROYSE CITY DATA CENTER Under construction Large load 11.3 mi
Sandman Solar Postponed Storage 12.9 mi 100

Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES

Sources

Attribution