Show on map
Sue Cleveland High School — Power plant · Solar · Terraform ArcadiaSLO-2 — Under construction · Solar · NM · 5 MW · 3.8 mi awayCNM WESTSIDE DATA CENTER — Filed · Large load · NM · 8.2 mi awayCSC-A — Built · Large load · NM · 11.6 mi awayOso Negro — Permitted · Storage · NM · 100 MW · 14.4 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Sue Cleveland High School

Power plant · Solar

Key facts

Power plant · Solarran 26% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
2,254 MWh
Grid
12 kV to Public Service Co of NM (PNM)
Location
Sandoval County, New Mexico
Operated by
Terraform ArcadiaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
13 years since 2013
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817998
Location id
L100000815162
Eia plant ids
58588
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Public Service Co of NM
Balancing authority code
PNM
Balancing authority name
Public Service Company of New Mexico
Fuel burned (MMBtu), 20257,692
Capacity factor, 20250.257
Net generation (MWh), 20252,254
Balancing authority codePNM

Solar arrays

Array area (acres)
5.4
AC capacity (MW)
1
DC capacity (MW)
1.2
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2013

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SLO-2 Under construction Solar 3.8 mi 5
CNM WESTSIDE DATA CENTER Filed Large load 8.2 mi
CSC-A Built Large load 11.6 mi
Oso Negro Permitted Storage 14.4 mi 100

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution