Show on map
Sun Devil Solar — Power plant · Solar · Cypress Creek RenewablesBRE NC Solar 4 — Solar · NC · 5 MW · 18.4 km awayRoman Solar — Solar · NC · 5 MW · 20.2 km awayBRE NC Solar 2 — Solar · NC · 5 MW · 20.7 km away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Sun Devil Solar

Power plant · Solar

Key facts

Power plant · Solarran 17% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
7,463 MWh
Grid
23 kV to Duke Energy Progress - (NC) (CPLE)
Location
Warren County, North Carolina
Operated by
Cypress Creek RenewablesSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2015 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
11 years since 2015
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000818022
Location id
L100000815183
Eia plant ids
59505
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
22.90
Transmission owner
Duke Energy Progress - (NC)
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Fuel burned (MMBtu), 202525,462
Capacity factor, 20250.170
Net generation (MWh), 20257,463
Balancing authority codeCPLE

Solar array

Array area (acres)
19.9
AC capacity (MW)
5
DC capacity (MW)
6.2
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2015

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
BRE NC Solar 4 Postponed Solar 18.4 km 5
Roman Solar Postponed Solar 20.2 km 5
BRE NC Solar 2 Postponed Solar 20.7 km 5

Sources EIA-860M

Sources

Attribution