Show on map
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
SUNOCO LLC, EULESS: location and 9 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Sunoco LLC, Euless
Petroleum product terminal
As filed: SUNOCO LLC, EULESS
Key facts
Petroleum product terminal Operating- Location
- Texas
Details
Who’s behind it
- Owner
- Sunoco LLCSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
Capacity not stated
All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
| Attribute | Value |
|---|---|
| Padd | 3 |
| Site | EULESS |
| Survey | EIA-815 |
| Owner, as the source states it | SUNOCO LLC |
| Source release | 202109 |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Sources
- EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)
- EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Around this asset
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| QTS 6431 Longhorn Dr. Irving TX Built | Large load | 14.0 km | |
| QUALITY INVESTMENT PROPERTIES IRVING Built | Large load | 14.2 km | |
| AREP LAS COLINAS DATA CENTER Under construction | Large load | 16.7 km | |
| LR 1300 (Irving data centre) Filed | Large load | 16.8 km | |
| DA12 (Dallas data centre) Filed | Large load | 22.0 km | |
| EXXONMOBIL DALLAS DATA CENTER Built | Large load | 22.1 km | |
| Fort Watt Storage Postponed | Storage | 22.8 km | 200 |
| 2501 Edmonds Ln Lewisville TX Data Center Filed | Large load | 22.8 km | |
| FTW DATA CENTER Under construction | Large load | 24.7 km |
Sources FAA OE/AAA · EPA ICIS-Air · EPA ICIS-NPDES · EIA-860M
Sources
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- EIA-860M Preliminary Monthly Electric Generator Inventory