SUNY Old Westbury College
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 5% of 2022 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2007
- Net generation, 2022
- 745 MWh
- Location
- Nassau County, New York
- Operated by
- SUNY Old Westbury CollegeSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 19 years since 2007
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | NYIS |
Data notes (1)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- March 2022
- Capacity retired
- 1.8 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GE | Natural Gas Internal Combustion Engine | 1.8 MW | Retired | March 2022 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- NYIS
Transmission lines within 15 mi (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit GE scheduled to retire, 1.8 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Farmingdale Fuel Cell Postponed | Gas, other | 8.8 mi | 1.4 |
| Plant No 1 Freeport Under construction | Biomass | 9.9 mi | 3 |
| Water Willow A Clean Energy LLC Under construction | Storage | 12.8 mi | 3.9 |
| Water Willow B Clean Energy LLC Under construction | Storage | 12.8 mi | 3.9 |
| Hecate Grid Intrepid Postponed | Storage | 13.1 mi | 300 |
| Clermont Postponed | Storage | 13.2 mi | 100 |
| KCE NY 30, LLC Announced | Storage | 13.3 mi | 50 |
Sources EIA-860M