Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1966
Net generation, 2025
789 MWh
Grid
40 kV to DTE Electric Company (MISO)
Location
Washtenaw County, Michigan
Operated by
DTE Electric CompanySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
60 years since 1966
Unused energy
560 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
27,356 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
40
Transmission owner
DTE Electric Company
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 202521,584
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202527,356.1
Net generation (MWh), 2025789
Balancing authority codeMISO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Wheeler Center Solar Park Postponed Solar 7.7 km 20
Project Cannoli Data Center Filed Large load 17.6 km
Voyager Energy Storage Under construction Storage 20.0 km 100