Show on map
Surges Road Substation 138 kV line — Transmission lineGemstone Solar LLC — Permitted · Solar · MI · 150 MW · 8.9 mi awayAMAZON DATA SERVICES INCORPORATED — Built · Large load · IN · 14.4 mi awaySt Joseph Energy Center — Postponed · Gas, combined cycle · IN · 1,406 MW · 14.7 mi away
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Surges Road Substation 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-MI
Owner (as stated)
AEP

Details

Who’s behind it

Owner
AEP

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
5
Substations at the ends (as the source names them)
Surges Road Substation
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itaep
HIFLD line ID400244
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Gemstone Solar LLC Permitted Solar 8.9 mi 150
AMAZON DATA SERVICES INCORPORATED Built Large load 14.4 mi
St Joseph Energy Center Postponed Gas, combined cycle 14.7 mi 1,406

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution