Show on map
Sutherland IC — Power plant · Oil · Sutherland City of
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Sutherland IC

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2012 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1935
Net generation, 2012
229 MWh
Location
Lincoln County, Nebraska
Operated by
Sutherland City ofSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2013
Fuel burned MMBtu by year, 2001 to 2013
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
91 years since 1935
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeNPPD

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
May 2013
First unit retired
May 2002
Capacity retired
3 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Petroleum Liquids0.2 MWRetiredMay 2002
1Petroleum Liquids0.5 MWRetiredMay 2013
2Petroleum Liquids0.9 MWRetiredMay 2013
4Petroleum Liquids1.4 MWRetiredMay 2013

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
NPPD
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 4 scheduled to retire, 2.8 MW · EIA-860M
  • Stated Unit 3 scheduled to retire, 0.2 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

View at source