- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
SV CSG Kirkland 1 LLC: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
SV CSG Kirkland 1 LLC
Power plant · Solar
Key facts
Power plant · Solarran 7% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2024
- Net generation, 2025
- 1,267 MWh
- Grid
- 35 kV to Commonwealth Edison Co (PJM)
- Location
- DeKalb County, Illinois
- Operated by
- SRC Partnership 12, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 1,267
MWh - Fuel burned, 2025
- 4,323
MMBtu - Capacity factor, 2025
- 7.2
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 1,267 | 4,323 | 7.2% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.