Show on map
Sweeny — Power plant · Storage · ENGIE North AmericaBell Creek BESS LLC — Storage · TX · 200.9 MW · 9.3 km awayCastor — Storage · TX · 200 MW · 11.1 km awayBrazos River BESS LLC — Storage · TX · 180.4 MW · 12.3 km awaySecond Division Solar — Storage · TX · 30 MW · 13.8 km awayElio Energy LLC — Storage · TX · 205.3 MW · 21.4 km awayNash Solar — Solar · TX · 10 MW · 23.8 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
-394 MWh
Grid
12 kV to Texas-New Mexico Power Co (ERCO)
Location
Brazoria County, Texas
Operated by
ENGIE North AmericaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
5 years since 2021
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
12.50
Transmission owner
Texas-New Mexico Power Co
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-394
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -394.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Bell Creek BESS LLC Contracted Storage 9.3 km 200.9
Castor Under construction Storage 11.1 km 200
Brazos River BESS LLC Contracted Storage 12.3 km 180.4
Second Division Solar Studied Storage 13.8 km 30
Elio Energy LLC Contracted Storage 21.4 km 205.3
Nash Solar Under construction Solar 23.8 km 10

Sources ERCOT · EIA-860M

Sources

Attribution