System Control Center: location and 6 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
System Control Center
Power plant · Storage
Key facts
Power plant · Storage Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2012
- Net generation, 2025
- 0 MWh
- Grid
- 13 kV to Austin Energy (ERCO)
- Location
- Travis County, Texas
- Operated by
- Austin EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Flywheels”
- Age
- 14 years since 2012
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | ERCO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Timeline
- In service · EIA-860M
Sources
2 sourcesAround this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| AMD Phase 2 (Austin data centre) Filed | Large load | 2.1 km | |
| Austin TX GigaFactory × 2 units Under construction | Solar | 8.6 km | 3.3 |
| SMT DC Austin I (Austin data centre) Filed | Large load | 12.7 km | |
| Metro BESS Studied | Storage | 24.3 km | 200.7 |
| Pecan Crossing Building 2 (Pflugerville data centre) Filed | Large load | 24.9 km |
Sources FAA OE/AAA · EIA-860M · ERCOT