Show on map
TAG — Power plant · Solar · Exus New MexicoCNM WESTSIDE DATA CENTER — Large load · NM · 14.1 km awayOso Negro — Storage · NM · 100 MW · 22.0 km awayWESTPOINTE DATA CENTER — Large load · NM · 23.3 km awaySLO-2 — Solar · NM · 5 MW · 23.3 km away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
115 kV to Public Service Co of NM (PNM)
Location
Sandoval County, New Mexico
Operated by
Exus New MexicoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001058754
Location id
L100001050987
Eia plant ids
67710
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
115
Transmission owner
Public Service Co of NM
Balancing authority code
PNM
Balancing authority name
Public Service Company of New Mexico
Fuel burned (MMBtu), 2025328,282
Capacity factor, 20250.054
Net generation (MWh), 202593,269
Balancing authority codePNM

Solar array

Array area (acres)
667.9
AC capacity (MW)
140
DC capacity (MW)
140
Site type
Greenfield
Began operating
2025

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CNM WESTSIDE DATA CENTER Filed Large load 14.1 km
Oso Negro Permitted Storage 22.0 km 100
WESTPOINTE DATA CENTER Built Large load 23.3 km
SLO-2 Under construction Solar 23.3 km 5