Show on map
Talbert Tap - Burches Hill 230 kV — Transmission lineMattawoman Energy Center — Postponed · Gas, combined cycle · MD · 1,008 MW · 2.2 mi awayMadison Solar 1 LLC — Postponed · Solar · DC · 1.2 MW · 9.4 mi awayNCBP TEN, LLC — Under construction · Solar · MD · 1.4 MW · 10.9 mi awayNCBP ONE, LLC — Under construction · Solar · MD · 2.5 MW · 11.1 mi awayNCBP Seven — Under construction · Solar · MD · 2.4 MW · 11.1 mi awayNCBP TWELVE, LLC — Under construction · Solar · MD · 1.2 MW · 11.3 mi awayMDD109-NCBP BLDG 11-Manekin — Under construction · Solar · MD · 2.4 MW · 11.5 mi awayCity of Bowie — Under construction · Solar · MD · 2 MW · 14.5 mi awayCHP Plant — Under construction · Gas, combustion turbine · DC · 5.7 MW · 14.9 mi away
  • Combustion
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Talbert Tap - Burches Hill 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-MD
Owner (as stated)
Potomac Electric Power

Details

Who’s behind it

Owner
Potomac Electric Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
4
Substations at the ends (as the source names them)
Talbert Tap to Burches Hill
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpotomac electric power
HIFLD line ID136537
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Mattawoman Energy Center Postponed Gas, combined cycle 2.2 mi 1,008
Madison Solar 1 LLC Postponed Solar 9.4 mi 1.2
NCBP TEN, LLC Under construction Solar 10.9 mi 1.4
NCBP ONE, LLC Under construction Solar 11.1 mi 2.5
NCBP Seven Under construction Solar 11.1 mi 2.4
NCBP TWELVE, LLC Under construction Solar 11.3 mi 1.2
MDD109-NCBP BLDG 11-Manekin Under construction Solar 11.5 mi 2.4
City of Bowie Under construction Solar 14.5 mi 2
CHP Plant Under construction Gas, combustion turbine 14.9 mi 5.7

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution