Show on map
TalenEnergy Montour — Power plant · Gas, steam turbine · TalenEnergy Montour LLCLiberty Keefer Mill Road Solar LLC — Permitted · Solar · PA · 3 MW · 3.0 mi awayCottontail Solar 3 — Postponed · Solar · PA · 20 MW · 4.4 mi awayMadison Taylor Road Solar LLC — Under construction · Solar · PA · 3 MW · 7.3 mi awayGreenwood Route 254 Solar LLC — Under construction · Solar · PA · 3 MW · 9.1 mi awayMontour Tower Drive Solar LLC — Permitted · Solar · PA · 3 MW · 9.7 mi awayDelaware Conrath Road Solar LLC — Permitted · Solar · PA · 3 MW · 10.0 mi awayGreenwood Bottom Road Solar LLC — Under construction · Solar · PA · 3 MW · 10.1 mi awayNorthumberland Solar — Postponed · Storage · PA · 20 MW · 10.5 mi awayPenn Shoofly Solar LLC — Permitted · Solar · PA · 3 MW · 10.5 mi awayCottontail Solar 9 — Postponed · Solar · PA · 20 MW · 10.6 mi awayMountain Holly Solar — Postponed · Solar · PA · 20 MW · 10.9 mi awayMuncy Creek Lime Bluff Road Solar — Permitted · Solar · PA · 3 MW · 11.3 mi awayCottontail Solar 7 — Postponed · Solar · PA · 21.1 MW · 13.5 mi away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

TalenEnergy Montour

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 31% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1972
Net generation, 2025
4,717,153 MWh
Grid
230 kV to PPL Electric Utilities Corp (PJM)
Location
Montour County, Pennsylvania

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
54 years since 1972
Unused energy
10,682 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,163 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110060088836
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000893
Fuel burned (MMBtu), 202547,938,867
Capacity factor, 20250.306
Heat rate (Btu/kWh), 202510,162.7
Net generation (MWh), 20254,717,153.0
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
17.2 MW
Generators retired
1
Capacity still in service
1,757.9 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
11Conventional Steam Coal17.2 MWRetiredFebruary 2019

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
PPL Electric Utilities Corp
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
TALEN ENERGY CORP Owner 100.0% Dec 31, 2023 EPA GHGRP
TalenEnergy Montour LLC Operator EIA-860M

Timeline

  • Stated Unit 11 scheduled to retire, 17.2 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Liberty Keefer Mill Road Solar LLC Permitted Solar 3.0 mi 3
Cottontail Solar 3 Postponed Solar 4.4 mi 20
Madison Taylor Road Solar LLC Under construction Solar 7.3 mi 3
Greenwood Route 254 Solar LLC Under construction Solar 9.1 mi 3
Montour Tower Drive Solar LLC Permitted Solar 9.7 mi 3
Delaware Conrath Road Solar LLC Permitted Solar 10.0 mi 3
Greenwood Bottom Road Solar LLC Under construction Solar 10.1 mi 3
Northumberland Solar Postponed Storage 10.5 mi 20
Penn Shoofly Solar LLC Permitted Solar 10.5 mi 3
Cottontail Solar 9 Postponed Solar 10.6 mi 20
Mountain Holly Solar Postponed Solar 10.9 mi 20
Muncy Creek Lime Bluff Road Solar Permitted Solar 11.3 mi 3
Cottontail Solar 7 Postponed Solar 13.5 mi 21.1

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution