- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Tangier: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Tangier
Power plant · Oil
Key facts
Power plant · Oilran 1% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1993
- Net generation, 2025
- 177 MWh
- Grid
- 12 kV to A & N Electric Coop (PJM)
- Location
- Accomack County, Virginia
- Operated by
- A & N Electric CoopSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 177
MWh - Fuel burned, 2025
- 1,814
MMBtu - Capacity factor, 2025
- 0.8
% - Heat rate, 2025
- 10,249
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 177 | 1,814 | 0.8% | 10,249 |
| 2024 | 203 | 2,157 | 1.0% | 10,626 |
| 2023 | 88 | 957 | 0.4% | 10,875 |
| 2022 | 170 | 1,825 | 0.8% | 10,735 |
| 2021 | 243 | 2,559 | 1.2% | 10,531 |
| 2020 | 338 | 3,498 | 1.6% | 10,349 |
| 2019 | 395 | 4,088 | 1.9% | 10,349 |
| 2018 | 165 | 1,816 | 0.8% | 11,006 |
| 2017 | 0 | 0 | — | — |
| 2016 | 8 | 118 | 0.0% | 14,750 |
| 2015 | 159 | 1,594 | 0.8% | 10,025 |
| 2014 | 166 | 1,717 | 0.8% | 10,343 |
| 2013 | 66 | 689 | 0.3% | 10,439 |
| 2012 | 117 | 1,352 | 0.5% | 11,556 |
| 2011 | 286 | 3,116 | 1.4% | 10,895 |
| 2010 | 52 | 677 | 0.2% | 13,034 |
| 2009 | 60 | 650 | 0.3% | 10,873 |
| 2008 | 71 | 1,705 | 0.3% | 24,164 |
| 2007 | 60 | 945 | 0.3% | 15,808 |
| 2006 | -21 | 1,172 | — | — |
| 2005 | 227 | 4,263 | 1.1% | 18,780 |
| 2004 | 102 | 1,692 | 0.5% | 16,588 |
| 2003 | 134 | 2,203 | 0.6% | 16,440 |
| 2002 | 433 | 5,690 | 2.1% | 13,141 |
| 2001 | 378 | 4,887 | 1.8% | 12,929 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.