Show on map
Tarzanastation U - Kenter Canyon 230 kV — Transmission line20525 Nordhoff PV (North) — Under construction · Solar · CA · 1.9 MW · 4.4 mi awayAB Van Nuys — Announced · Solar · CA · 1.6 MW · 4.8 mi awayVan Norman Bypass Solar Project — Postponed · Solar · CA · 2 MW · 8.5 mi awayLas Virgenes MWD - Composting Plant — Under construction · Solar + storage · CA · 1.4 MW · 9.1 mi awayScattergood — Postponed · Gas, combined cycle · CA · 346 MW · 10.9 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 12.8 mi awayFoothill Solar Project — Postponed · Solar · CA · 1.1 MW · 13.1 mi awayHumidor Storage I — Contracted · Storage · CA · 300 MW · 14.2 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Tarzanastation U - Kenter Canyon 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA
Owner (as stated)
Los Angeles Department Of Water Power

Details

Who’s behind it

Owner
Los Angeles Department Of Water Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
9
Substations at the ends (as the source names them)
Tarzanastation U to Kenter Canyon
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itlos angeles department of water power
HIFLD line ID302890
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
20525 Nordhoff PV (North) Under construction Solar 4.4 mi 1.9
AB Van Nuys Announced Solar 4.8 mi 1.6
Van Norman Bypass Solar Project Postponed Solar 8.5 mi 2
Las Virgenes MWD - Composting Plant Under construction Solar + storage 9.1 mi 1.4
Scattergood Postponed Gas, combined cycle 10.9 mi 346
LATTC South Campus Solar Postponed Solar 12.8 mi 1.1
Foothill Solar Project Postponed Solar 13.1 mi 1.1
Humidor Storage I Contracted Storage 14.2 mi 300

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 17, 2026Source: California ISO

Attribution