Tarzanastation U - Station J 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-CA
- Owner (as stated)
- Los Angeles Department Of Water Power
Details
Who’s behind it
- Owner
- Los Angeles Department Of Water Power
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 4
- Substations at the ends (as the source names them)
- Tarzanastation U to Station J
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | los angeles department of water power |
| HIFLD line ID | 302978 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| 20525 Nordhoff PV (North) Under construction | Solar | 2.1 mi | 1.9 |
| AB Van Nuys Announced | Solar | 3.9 mi | 1.6 |
| Van Norman Bypass Solar Project Postponed | Solar | 5.5 mi | 2 |
| Las Virgenes MWD - Composting Plant Under construction | Solar + storage | 9.6 mi | 1.4 |
| Foothill Solar Project Postponed | Solar | 11.7 mi | 1.1 |
| Humidor Storage I Contracted | Storage | 12.5 mi | 300 |
| Six Flags Magic Mountain Under construction | Solar + storage | 14.0 mi | 12 |