Show on map
Tasley — Power plant · Oil · Calpine Mid-Atlantic Generation LLC
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1972
Net generation, 2025
2,644 MWh
Grid
69 kV to Delmarva Power (PJM)
Location
Accomack County, Virginia
Operated by
Calpine Mid-Atlantic Generation LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
54 years since 1972
Heat rate
15,660 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
69
Transmission owner
Delmarva Power
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Eia status
By code
SB
Mw
27
Units
1
Standby mw
27
Status rule
majority_mw_standby
In service mw
27
Out of service mw
0
Fuel burned (MMBtu), 202541,406
Capacity factor, 20250.011
Heat rate (Btu/kWh), 202515,660.4
Net generation (MWh), 20252,644
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source