Tech Square Microgrid: location and 15 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Tech Square Microgrid
Power plant · Oil
Key facts
Power plant · Oilran 12% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 1,499 MWh
- Grid
- 20 kV, 4 kV to Georgia Power Co (SOCO)
- Location
- Fulton County, Georgia
- Operated by
- Georgia Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 6 years since 2020
- Unused energy
- 11 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 6,808 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 10,206 |
| Capacity factor, 2025 | 0.122 |
| Heat rate (Btu/kWh), 2025 | 6,808.5 |
| Net generation (MWh), 2025 | 1,499 |
| Balancing authority code | SOCO |
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| DATA CENTER ATLANTA, LLC Built | Large load | 0.2 km | |
| QUALITY INVESTMENT PROPERTIES METRO, LLC Built | Large load | 2.8 km | |
| Leibherr LR 1400 (Atlanta data centre) Filed | Large load | 7.1 km | |
| TA Reality Ellenwood Data Center Filed | Large load | 16.6 km | |
| FT GIllem MASE Crane (Forest Park data centre) Filed | Large load | 16.7 km | |
| DeKalb County Green Energy Facility Postponed | Biomass | 18.0 km | 1.6 |
| GOOGLE, INC. Built | Large load | 18.1 km | |
| ATL06 DATA CENTER Under construction | Large load | 18.8 km | |
| ATL11 DATA CENTER Built | Large load | 19.1 km | |
| Vantage Data Center Crane Under construction | Large load | 19.3 km | |
| ROCK HOUSE ROAD DATA CENTER Under construction | Large load | 19.8 km | |
| ALIGNED DATA CENTERS ATL01 Built | Large load | 21.8 km | |
| FTY01 DATA CENTER Under construction | Large load | 22.0 km | |
| Vantage Data Centers GA1, LLC Under construction | Large load | 23.1 km | |
| EDGECONNEX ATL11, LLC Filed | Large load | 23.2 km |
Sources EPA ICIS-Air · FAA OE/AAA · EIA-860M · EPA ICIS-NPDES · Georgia EPD
Sources
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- Georgia EPD Air Web issued air permits (data-centre and hosting facilities, first permitted in the last 24 months)Source: Georgia Environmental Protection Division, Air Protection Branch