Show on map
Tedder Solar — Power plant · Solar · Tedder SolarScarlet Solar — Postponed · Solar · SC · 2 MW · 3.0 mi awayBell Solar — Postponed · Solar · SC · 6.1 MW · 3.2 mi awayRollins Solar — Permitted · Solar · SC · 74.9 MW · 6.3 mi awayMiddleton Solar — Postponed · Solar · SC · 2 MW · 9.1 mi awayMadison Solar — Postponed · Solar · SC · 10.9 MW · 9.6 mi awayGEB Solar — Permitted · Solar · SC · 50 MW · 10.2 mi awayRoss Solar — Permitted · Solar · SC · 74.9 MW · 10.7 mi awayB & K Solar — Under construction · Solar · SC · 74.9 MW · 11.5 mi awayCulpepper Solar — Permitted · Solar · SC · 74.9 MW · 11.5 mi awayDadswell Solar — Postponed · Solar · SC · 1 MW · 13.3 mi awayMcCormick Solar — Postponed · Solar · SC · 2 MW · 13.4 mi awayShorthorn Solar — Permitted · Solar · SC · 60 MW · 13.9 mi awayLotus Solar — Permitted · Solar · SC · 75 MW · 14.4 mi away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Tedder Solar

Power plant · Solar

Key facts

Power plant · Solarran 19% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
3,326 MWh
Grid
23 kV to Duke Energy Progress - (NC) (CPLE)
Location
Darlington County, South Carolina
Operated by
Tedder SolarSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000818136
Location id
L100000815282
Eia plant ids
62315
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
22.90
Transmission owner
Duke Energy Progress - (NC)
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Fuel burned (MMBtu), 202511,349
Capacity factor, 20250.190
Net generation (MWh), 20253,326
Balancing authority codeCPLE

Solar arrays

Array area (acres)
11.5
AC capacity (MW)
2
DC capacity (MW)
2.8
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Scarlet Solar Postponed Solar 3.0 mi 2
Bell Solar Postponed Solar 3.2 mi 6.1
Rollins Solar Permitted Solar 6.3 mi 74.9
Middleton Solar Postponed Solar 9.1 mi 2
Madison Solar Postponed Solar 9.6 mi 10.9
GEB Solar Permitted Solar 10.2 mi 50
Ross Solar Permitted Solar 10.7 mi 74.9
B & K Solar Under construction Solar 11.5 mi 74.9
Culpepper Solar Permitted Solar 11.5 mi 74.9
Dadswell Solar Postponed Solar 13.3 mi 1
McCormick Solar Postponed Solar 13.4 mi 2
Shorthorn Solar Permitted Solar 13.9 mi 60
Lotus Solar Permitted Solar 14.4 mi 75

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution